Welding Fume & Dust Treatment for
Honda Power (China) Co., Ltd.

Design, fabrication, installation and full environmental compliance for the new pump frame welding line at Honda's Liangjiang New Area plant β€” from explosion-proof capture worktops to a code-compliant stack with sampling platform, delivered and accepted within 50 days.

Project Overview

One Line, Two Stations, Zero Compliance Gaps

Honda's new pump frame line pairs one grinding station with one robot welding cell. We supplied the complete air-pollution control package plus the surrounding plant infrastructure:

  • β–ͺ
    Dual-station explosion-proof capture worktops β€” 1,600 Γ— 1,500 Γ— 800 mm, carbon steel, ex-proof motors, luminaires and control cabinets
  • β–ͺ
    Negative-pressure capture hoods β€” 1,700 Γ— 1,400 Γ— 1,200 mm, galvanized, capture efficiency > 90%, interlocked with the welding equipment
  • β–ͺ
    Galvanized ducting with balancing dampers at every hood connection
  • β–ͺ
    Plant infrastructure β€” process racks, cable trays, argon piping, fans, task lighting and an A-grade fire-rated protective wall around the robot cell

Every guarantee was written into the contract β€” and verified by third-party monitoring at acceptance:

GuaranteeCommitted Value
Fume capture efficiencyβ‰₯ 90% (negative pressure, interlocked)
Dust removal efficiencyβ‰₯ 95% at the collector
Stack emissionDB 50/418-2016 limit βˆ’ 30% margin
Total system power≀ 20 kW (VFD fan)
Delivery & commissioning50 days from contract signing
System Design

From Capture Hood to Certified Stack

Welding fume particles are 0.1–1.25 Β΅m β€” half of it iron oxide, plus manganese dioxide and silica that cause welder pneumoconiosis. Sticky, oily fume is exactly what blinds ordinary filters, so the train is engineered around that reality.

1 Β· Capture at Source

Explosion-proof dual-station worktops and large capture hoods keep fume out of the welder's breathing zone. Dampers balance airflow across stations; the system starts and stops together with the line.

2 Β· Spark & Mist Pre-Filter

A stainless-steel mesh demister box ahead of the collector traps welding sparks and oily aerosol β€” protecting the cartridges from both fire risk and blinding.

3 Β· Central Cartridge Collector

Donaldson-type vertical pleated cartridges (Ø350 Γ— 660 mm, 7–8 mΒ² each) with flame-retardant media rated to 150 Β°C, 0.5–1.0 Β΅m filtration and ≀ 45 Pa initial resistance. PLC-programmed pulse cleaning; carbon steel housing with explosion vent panel.

4 Β· VFD Fan & Smart Control

Downstream variable-frequency fan (negative-pressure layout keeps ductwork leak-free) with soft-start, overload, over-temperature and fire interlocks; e-stop buttons at the cabinet and every operator station.

5 Β· Stack + Sampling Platform

Galvanized stack on a carbon-steel tower with code-compliant sampling platform, yellow-guarded safe access, and C25 concrete foundation (7,000 Γ— 3,000 Γ— 200 mm) β€” ready for third-party monitoring from day one.

6 Β· VOCs Stage (Same Plant)

We also delivered the catalytic combustion (RCO) adsorption–desorption train for Honda's organic exhaust stream β€” same works, same quality standard, installed and commissioned by our own crews.

More Than Equipment

Full Environmental Compliance, Handled for You

Buying a collector is easy β€” getting the line legally operational is not. For Honda we ran the entire compliance track in parallel with manufacturing:

  • βœ“
    Environmental documentation & expert review β€” assessment reports prepared and passed
  • βœ“
    Pollutant discharge permit change β€” processed with the local ecology & environment bureau
  • βœ“
    New discharge outlet registration β€” plant outfall added and approved
  • βœ“
    Third-party monitoring & acceptance β€” stack testing organized, results verified against DB 50/418-2016
  • βœ“
    Safety & occupational health "three-simultaneity" β€” third-party pre-assessment coordinated
  • βœ“
    Noise control β€” designed to plant-boundary noise standards with fan sizing and silencing
On-Site Photos

Delivered, Installed, Certified β€” at Honda's Chongqing Plant

August 2026: welding line and purification system in operation. November 2026: high-emission stacks with sampling platforms on the plant roof. Our factory photos show the RCO train before shipment.